Info Training:
081 3211 70714 (Kurniawan Hidayat)
081 3214 55501 (Ganjar Nugraha)
LABORATORIUM | ||
---|---|---|
Tanggal | Judul Training | Harga |
3-4 | Implementasi SNI ISO/IEC 17025:2008 | Rp3,700,000 |
3-4 | Teknik Kalibrasi Suhu (Termokopel) | Rp4,000,000 |
3-4 | Teknik Kalibrasi Listrik (Sine Wave Generator) | Rp4,000,000 |
3-4 | Estimasi Ketidakpastian Pengukuran pada Analisis Spektrofotometri (UV-Vis, FT-IR, AAS) | Rp4,000,000 |
3-4 | Estimasi Ketidakpastian Pengukuran Dimensi, Massa dan Volume | Rp4,000,000 |
10-11 | Dokumentasi SNI ISO/IEC 17025:2008 | Rp3,700,000 |
10-11 | Teknik Kalibrasi Conductivity Meter | Rp4,000,000 |
10-11 | Teknik Analisis Kromatografi Gas Spektrometri Massa (GC-MS) | Rp4,500,000 |
11-12 | Teknik Supervisi dan Inspeksi Mutu | Rp3,700,000 |
11-12 | Teknik Analisis PCR-Elisa | Rp4,500,000 |
11-12 | Verifikasi Hasil Kalibrasi & Evaluasi Intermediate Check | Rp4,000,000 |
12-13 | Internal Audit SNI ISO/IEC 17025:2008 | Rp3,700,000 |
12-13 | Teknik Kalibrasi Suhu (Oven dan Furnace) | Rp4,000,000 |
12-13 | Sistem Pengukuran Gas dengan Flowmeter | Rp4,500,000 |
12-13 | Verifikasi dan Validasi Metode Spektrofotometri UV-Vis | Rp4,000,000 |
17-18 | Implementasi ISO/IEC 17020:2012 | Rp3,700,000 |
17-18 | Teknik Kalibrasi Tekanan (Pressure Gauge Digital Oil/Pneumatic) | Rp4,000,000 |
17-18 | Teknik Analisis Spektrofotometri Serapan Atom (AAS) Graphite Furnace | Rp4,500,000 |
17-18 | Teknik Analisis Inductively Coupled Plasma (ICP) MS | Rp4,500,000 |
18-19 | Teknik Kalibrasi Volumetric Glassware | Rp4,000,000 |
18-19 | Quality Control Laboratorium | Rp4,000,000 |
19-20 | Internal Audit ISO/IEC 17020:2012 | Rp3,700,000 |
19-20 | Teknik Kalibrasi Dimensi (Micrometer & Caliper) | Rp4,000,000 |
19-20 | Sampling Control for Testing Sample | Rp4,000,000 |
19-20 | Kalibrasi, Verifikasi dan Troubleshooting pada UV-Vis | Rp4,000,000 |
24-25 | Dokumentasi SNI ISO 15189:2009 | Rp3,700,000 |
24-25 | Teknik Kalibrasi Gaya (Load Cell) | Rp4,000,000 |
24-25 | Teknik Kalibrasi Listrik (Oscilloscope & Avometer Analog) | Rp4,000,000 |
24-25 | Teknik Analisis Spektrofotometri Infra Merah (IR/FT-IR) | Rp4,000,000 |
24-25 | Kalibrasi, Verifikasi dan Troubleshooting pada GC-MS | Rp4,000,000 |
24-25 | Implementasi K3 di Laboratorium | Rp4,000,000 |
25-26 | Teknik Kalibrasi Massa (Anak Timbangan) | Rp4,000,000 |
25-26 | Teknik Evaluasi Hasil QC Lab dan Kompetensi Analis | Rp4,000,000 |
26-27 | Teknik Investigasi dan Closing Temuan Asesmen Lab | Rp4,000,000 |
26-27 | Teknik Analisis Kromatografi Cair Kinerja Ultra (UPLC) | Rp4,500,000 |
26-27 | Pembuatan Contoh Uji Profisiensi dan Bahan Acuan Sekunder | Rp4,000,000 |
26-27 | Manajemen Kompetensi Personil Kalibrasi | Rp4,000,000 |
QUALITY & PRODUCTION | ||
Tanggal | Judul Training | Harga |
3-4 | Implementasi ISO 9001:2015 | Rp3,500,000 |
3-4 | Executive Awareness of Six Sigma Program | Rp4,000,000 |
3-4 | Statistical Process Control & Capability Analysis with MS EXCEL | Rp3,700,000 |
3-4 | Continous Improvement Proses Produksi dengan Simulasi Promodel | Rp4,000,000 |
10-11 | Acceptance Sampling Plan (ASQ) | Rp4,000,000 |
10-11 | Improvement with Quality Control Circle (QCC) | Rp3,700,000 |
10-11 | Formulating Strategy-Based Initiatives with Balanced Scorecard | Rp3,700,000 |
12-13 | Implementasi ISO 9001 + IWA 2 | Rp3,500,000 |
12-13 | Dokumentasi ISO 9001:2015 | Rp3,500,000 |
12-13 | Lean Six Sigma | Rp4,000,000 |
12-13 | Statistical Process Control & Capability Analysis with MINITAB | Rp3,700,000 |
12-13 | Developing Effective Maintenance with Reliability-centred Maintenance | Rp4,000,000 |
12-13 | Teknik Pengujian Tabung LPG | Rp3,700,000 |
17-18 | Document Control | Rp3,700,000 |
17-18 | Project Cost & Budgeting Strategies | Rp4,000,000 |
18-19 | Achieving Zero Breakdown with Total Productive Maintenance | Rp4,000,000 |
18-20 | Audit Internal Integrasi Sistem ISO 9001, ISO 14001 & OHSAS 18001 (Based on ISO 19011) | Rp4,500,000 |
19-20 | Internal Audit ISO 9001:2015 | Rp3,500,000 |
19-20 | Zero Defect with Poka Yoke | Rp3,700,000 |
19-20 | Acceptance Sampling Plan (ISO 2859, MIL STD 105E & 414) | Rp4,000,000 |
19-20 | Managing Failure with P-M and Why - why Analysis | Rp4,000,000 |
19-20 | Designing Products and Services with Quality Function Deployment (QFD) | Rp3,800,000 |
19-20 | Project Management using Microsoft Project 2010 | Rp4,000,000 |
19-20 | Strategic Cost Reduction for Competitive Advantage | Rp3,700,000 |
24-25 | E-document Management System | Rp3,700,000 |
24-25 | Executive Introduction of ISO/TS 16949:2009 | Rp4,000,000 |
24-25 | Pengolahan dan Analisis Proses dengan Statistika Industri | Rp5,000,000 |
25-26 | Implementasi 6S (5S + Safety) | Rp3,700,000 |
25-26 | Cost of Quality Executive Overview | Rp3,700,000 |
26-27 | Implementasi 5S (Seiro, Seiton, Seiso, Seiketsu, Shitsuke) | Rp3,700,000 |
26-27 | Managing Failure with Failure Mode and Effect Analysis (FMEA) | Rp4,000,000 |
MACHINE & ELECTRICAL ENGINEERING | ||
Tanggal | Judul Training | Harga |
3-4 | Teknik Lubrikasi | Rp4,000,000 |
3-4 | Advance Instrument and Control | Rp4,000,000 |
10-11 | Electrical Submersible Pumps | Rp4,000,000 |
10-11 | Low Voltage Distribution and Protection Systems | Rp4,000,000 |
10-12 | STEAM TURBINES (Operation, maintenance and troubleshooting) | Rp5,500,000 |
10-12 | Manajemen Perawatan Bangunan Gedung Dan Fasilitas (Building Maintenance) | Rp5,500,000 |
11-12 | Electricity For Non Electrician | Rp4,000,000 |
11-13 | TURBO COMPRESSORS (Operation, Maintenance and Troubleshooting) | Rp5,500,000 |
12-13 | Vibration Analysis and Troubleshooting | Rp4,000,000 |
12-13 | Electrical Maintenance : Low and Medium Voltage Networks | Rp4,000,000 |
12-13 | Process Control & Loop Tunning | Rp4,000,000 |
12-13 | Electric Motor ( Operation, Maintenance and Trouble Shooting) | Rp4,000,000 |
17-18 | Motor Induksi (Maintenance & Troubleshooting) | Rp4,000,000 |
17-18 | Power Electronics and Drives | Rp4,000,000 |
17-19 | ROLLER BEARINGS (Basic, Operation, Maintenance and Troubleshooting) | Rp5,500,000 |
17-19 | 150 Kv Electrical Transmission Operation (Equipment and Maintenance) | Rp5,500,000 |
17-19 | Electrical Power System Analysis Using Etap | Rp5,500,000 |
18-20 | Power Transformer Diagnosis, Monitoring and Analysis | Rp5,500,000 |
18-20 | Electrical Powerline | Rp5,500,000 |
24-25 | Medium Voltage Systems and Equipment (Operation and Maintenance) | Rp4,000,000 |
24-25 | Low Voltage Electrical Power System Distribution | Rp4,000,000 |
24-26 | Electrical Power Motor - Generator (Operation, Protection and Maintanance) | Rp5,500,000 |
25-27 | High Voltage Equipment and Switchgear (Operation and Maintenance) | Rp5,500,000 |
26-27 | Belt Conveyor (Maintenance & Troubleshooting) | Rp4,000,000 |
26-27 | PLC Programming Principle and Practice Simulations | Rp4,000,000 |
26-27 | Electrostatic Ignition Of Fire and Explosion | Rp4,000,000 |
SUPPLY CHAIN | ||
Tanggal | Judul Training | Harga |
3-4 | Vehicle Routing Problem | Rp4,000,000 |
10-11 | KPI Design for Warehouse | Rp4,000,000 |
10-11 | Principles of Land Transportation | Rp4,000,000 |
10-11 | Material Management | Rp4,000,000 |
11-12 | Basic of Procurement Management | Rp3,700,000 |
11-12 | "Integrated Logistic Management | |
" | Rp4,000,000 | |
12-13 | Basic of Logistics Practices | Rp3,700,000 |
12-13 | Production Planning and Scheduling (product by order) | Rp4,000,000 |
17-18 | Green Logistics | Rp4,000,000 |
17-18 | E-Procurement | Rp4,000,000 |
17-18 | Vendor Selection | Rp4,000,000 |
18-19 | Managing People in SCM & Logistic | Rp4,000,000 |
19-20 | Fundamental of Supply Chain Management & Logistic | Rp3,700,000 |
19-20 | Vendor Relationship Management | Rp4,000,000 |
19-20 | IMPLEMENTASI ISO 28001:2007 Sistem Manajemen Keamanan untuk Rantai Pasokan | Rp4,000,000 |
24-25 | Basic of Transportation and Distribution | Rp3,700,000 |
24-25 | Fleet Management | Rp4,000,000 |
24-25 | Modern Warehouse Design | Rp4,000,000 |
24-25 | Decision Making with Analytical Hierarchy Process (AHP) | Rp4,000,000 |
25-26 | Communication Skills in Logistics | Rp4,000,000 |
26-27 | Safety In Logistics | Rp4,000,000 |
HEALTH, SAFETY & ENVIRONTMENT | ||
Tanggal | Judul Training | Harga |
3-4 | Implementasi ISO 14001:2015 | Rp3,700,000 |
3-4 | Transportasi Bahan Beracun Berbahaya (B3) | Rp4,000,000 |
3-4 | Implementasi Standar Manajemen Resiko ISO 31000:2009 | Rp3,700,000 |
10-11 | Dokumentasi ISO 14001:2015 | Rp3,700,000 |
10-11 | Safety Risk Management | Rp4,000,000 |
10-11 | Risk Assessment (Analisa Resiko) Kimia | Rp4,000,000 |
10-11 | Pembuatan Laporan Lingkungan | Rp4,000,000 |
10-11 | Pengelolaan Limbah Cair | Rp4,000,000 |
11-12 | Audit dan Manajemen Energi di Industri (Based on ISO 50001:2011) | Rp4,000,000 |
11-12 | Penanggulangan Tumpahan | Rp4,000,000 |
12-13 | Implementasi OHSAS 18001:2007 | Rp3,700,000 |
12-13 | Internal Audit ISO 14001:2015 | Rp3,700,000 |
12-13 | Waste Water Treatment | Rp4,000,000 |
12-13 | Process Hazard Analysis (PHA) Awareness | Rp4,000,000 |
12-13 | Pengelolaan Limbah Padat | Rp4,000,000 |
17-18 | Hazard Identification and Risk Assessment (HIRA) | Rp4,000,000 |
17-18 | Monitoring Lingkungan | Rp4,000,000 |
19-20 | Dokumentasi OHSAS 18001:2007 | Rp3,700,000 |
19-20 | Surat Izin Bekerja (working Permit) | Rp4,000,000 |
24-25 | Audit Internal OHSAS 18001:2007 | Rp3,700,000 |
24-25 | Green Procurement/RoHS System Guidelines | Rp4,000,000 |
24-25 | Process Safety Management (Awareness) | Rp4,500,000 |
26-27 | Globally Harmonized System (GHS) Sistem Klasifikasi dan Pelabelan Bahan Kimia B3 | Rp4,500,000 |
FINANCE | ||
Tanggal | Judul Training | Harga |
3-4 | Effective Cashflow Management | Rp3,700,000 |
11-12 | Teknik Penyusunan Laporan Keuangan | Rp3,700,000 |
17-18 | Petty Cash Management & Administration | Rp3,700,000 |
19-20 | Asset Management | Rp3,700,000 |
24-25 | Financial Statement Analysis | Rp3,700,000 |
26-27 | Basic Accounting | Rp3,700,000 |
MARKETING | ||
Tanggal | Judul Training | Harga |
3-4 | Brand Equity Survey (Methodology & Statistic) | Rp4,500,000 |
17-18 | Basic Statistical Analysis For Marketing Research Using R (Open Source Software) | Rp4,500,000 |
19-20 | Data Mining | Rp400,000 |
HRD | ||
Tanggal | Judul Training | Harga |
3-4 | Fast Track To Be A Super Manager | Rp3,800,000 |
10-11 | Human Capital Management | Rp3,800,000 |
11-12 | Strategic HRM and The HR Scorecard | Rp3,800,000 |
11-12 | IMPLEMENTASI ISO 260001:2010 Guidance on Social Responsibility | Rp4,000,000 |
12-13 | How to Develop and Implementing Winning KPI | Rp3,800,000 |
17-18 | Job Analysis | Rp3,800,000 |
17-18 | Competency - Based Human Capital Management | Rp3,800,000 |
17-18 | Competency Based Pay | Rp3,800,000 |
19-20 | HR Metrics: Driving HR Success | Rp3,800,000 |
24-25 | Competency Assessment | Rp3,800,000 |
24-25 | Training of Trainer | Rp3,800,000 |
24-25 | Outsourcing Management | Rp3,800,000 |
26-27 | Strategic Performance Management | Rp3,800,000 |
26-27 | Teknik Survey Kepuasan Karyawan | Rp3,800,000 |
MINING, OIL & GAS | ||
Tanggal | Judul Training | Harga |
3-4 | Teknologi Gasifikasi Batubara dan Penerapannya | Rp5,000,000 |
10-11 | Teknologi Pemanfaatan Batubara untuk PLTU | Rp5,000,000 |
10-12 | Model Pengambilan Sampel dan Metoda Perhitungan Cadangan Bijih Nikel | Rp5,500,000 |
11-12 | Teknologi Pengolahan dan Pemanfaatan Batubara | Rp5,000,000 |
19-20 | Teknik Sampling Batubara | Rp5,000,000 |
24-25 | Coal Handling | Rp5,000,000 |
26-27 | Energi Batubara dan Pemanfaatannya | Rp5,000,000 |
FOOD & AGRICULTURE | ||
Tanggal | Judul Training | Harga |
3-4 | Implementasi ISO 22000:2005 | Rp3,700,000 |
3-4 | Food Safety System Certification | Rp4,000,000 |
10-11 | Dokumentasi ISO 22000:2005 | Rp3,700,000 |
10-11 | Implementasi HACCP | Rp3,700,000 |
10-11 | Pelatihan Fasilitator Pertanian Organik | Rp3,700,000 |
12-13 | Internal Audit ISO 22000:2005 | Rp3,700,000 |
12-13 | Food Safety Program ( Inspection, Sampling, Pest Management) | Rp4,000,000 |
19-20 | Penyusunan Dokumen Sistem Mutu Pangan Organik | Rp3,700,000 |
19-20 | Internal Audit FSSC 22000 | Rp4,000,000 |
24-25 | Pelatihan Inspektor Organik | Rp3,700,000 |
CIVIL & CONTRUCTION | ||
Tanggal | Judul Training | Harga |
19-20 | Pengendalian Mutu Pekerjaan Beton Aspal Panas (Hot Mix) dan Pembuatan Job Mix Formula (JMF) | Rp4,500,000 |
25-26 | Pelaksanaan dan Pengendalian Mutu Pekerjaan Perkerasan Jalan Beton (Rigid Pavement) | Rp4,500,000 |
26-27 | Sistem Perkuatan Lereng jalan | Rp4,500,000 |
Tidak ada komentar:
Posting Komentar