Info Training:
081 3211 70714 (Kurniawan Hidayat)
081 3214 55501 (Ganjar Nugraha)
LABORATORIUM | ||
---|---|---|
Tanggal | Judul Training | Harga |
5-6 | Implementasi SNI ISO/IEC 17025:2008 | Rp3,700,000 |
5-6 | Teknik Kalibrasi Suhu (Termometer) | Rp4,000,000 |
5-6 | Teknik Analisis Spektrofotometri Serapan Atom (AAS) Flame | Rp4,500,000 |
5-6 | Kaji Ulang Manajemen dan Pengendalian Sistem Laboratorium | Rp4,000,000 |
5-6 | Verifikasi dan Validasi Metode Uji Kimia | Rp4,000,000 |
6-7 | Teknik Kalibrasi Listrik (Frequency Counter & Function Generator) | Rp4,000,000 |
6-7 | Estimasi Ketidakpastian Pengukuran Analisis Kimia | Rp4,000,000 |
7-8 | Dokumentasi SNI ISO/IEC 17025:2008 | Rp3,700,000 |
7-8 | Teknik Kalibrasi Tekanan (Pressure Gauge Analog Oil/Pneumatic) | Rp4,000,000 |
7-8 | Teknik Analisis Scanning Electron Microscope (SEM) | Rp4,500,000 |
7-8 | Pengendalian Alat dan Bahan Kimia di Laboratorium | Rp4,000,000 |
12-13 | Internal Audit SNI ISO/IEC 17025:2008 | Rp3,700,000 |
12-13 | Teknik Kalibrasi Suhu (Termohigrometer) | Rp4,000,000 |
12-13 | Teknik Analisis Kromatografi Cair Kinerja Tinggi (HPLC) | Rp4,500,000 |
12-13 | Uji Profisiensi Laboratorium (SNI-ISO/IEC 17043-2010) | Rp4,000,000 |
12-13 | Manajemen Peralatan Lab & Evaluasi Performa Alat ukur | Rp4,000,000 |
13-14 | Sistem Pengukuran dan Kalibrasi | Rp4,000,000 |
13-14 | Teknik Kalibrasi Listrik (Insulation Tester & Withstanding Voltage) | Rp4,000,000 |
14-15 | Implementasi SNI ISO 15189:2009 | Rp3,700,000 |
14-15 | Quality Assurance Laboratorium | Rp4,000,000 |
14-15 | Estimasi Ketidakpastian Pengukuran pada Analisis Kromatografi | Rp4,000,000 |
14-15 | Estimasi Ketidakpastian Pengukuran Hasil Kalibrasi | Rp4,000,000 |
19-20 | Internal Audit SNI ISO 15189:2009 | Rp3,700,000 |
19-20 | Teknik Kalibrasi Gaya (Proving Ring) | Rp4,000,000 |
19-20 | Teknik Kalibrasi pH Meter | Rp4,000,000 |
19-20 | Teknik Analisis Kromatografi Gas (GC) | Rp4,500,000 |
20-21 | Dokumentasi ISO/IEC 17020:2012 | Rp3,700,000 |
20-21 | Sistem Pengukuran Air dengan Flowmeter | Rp4,500,000 |
20-21 | Kalibrasi, Verifikasi dan Troubleshooting pada GC | Rp4,000,000 |
21-22 | Sistem Manajemen Informatika Laboratorium | Rp4,000,000 |
21-22 | Teknik Analisis Inductively Coupled Plasma (ICP) OES | Rp4,500,000 |
26-27 | Teknik Kalibrasi Massa (Timbangan) | Rp4,000,000 |
26-27 | Teknik Analisis Spektrofotometri UV-Vis | Rp4,000,000 |
26-27 | Verifikasi dan Validasi Metode Kromatografi Gas (GC) | Rp4,000,000 |
27-28 | Sistem Pengukuran Minyak dengan Flowmeter | Rp4,500,000 |
27-28 | Penanganan Bahan Acuan Bersertifikat (CRM) | Rp4,000,000 |
28-29 | Teknik Analisis Data di Laboratorium | Rp4,000,000 |
28-29 | Teknik Kalibrasi Listrik (Multimeter & RF Power Meter) | Rp4,000,000 |
28-29 | Teknik Analisis IC (Ion Chromatography) | Rp4,500,000 |
QUALITY & PRODUCTION | ||
Tanggal | Judul Training | Harga |
5-6 | Implementasi ISO 9001:2015 | Rp3,500,000 |
5-6 | Total Quality Management (TQM) | Rp4,000,000 |
5-6 | Statistical Process Control & Capability Analysis with MS EXCEL | Rp3,700,000 |
5-6 | Pengolahan dan Analisis Data Kegagalan | Rp5,000,000 |
5-6 | Manufacturing Performance Indicator | Rp4,000,000 |
6-7 | HORENSO (Houkoku-Renraku-Soudan) Japanese Communication System | Rp3,700,000 |
7-8 | Implementasi ISO 9001 + IWA 2 | Rp3,500,000 |
7-8 | Dokumentasi ISO 9001:2015 | Rp3,500,000 |
7-8 | Acceptance Sampling Plan (ISO 2859, MIL STD 105E & 414) | Rp4,000,000 |
7-8 | Product Development with APQP and PPAP | Rp4,000,000 |
7-8 | Business Process Reengineering | Rp3,700,000 |
12-13 | Statistical Process Control & Capability Analysis with MINITAB | Rp3,700,000 |
12-13 | Basic of Project Management | Rp4,000,000 |
13-14 | Maintenance Priority Index (MPI) dengan Proses SERP (Sistem & Equipment Reliability & Prioritization) | Rp4,000,000 |
14-15 | Internal Audit ISO 9001:2015 | Rp3,500,000 |
14-15 | Implementasi 5S (Seiro, Seiton, Seiso, Seiketsu, Shitsuke) | Rp3,700,000 |
14-15 | Measurement System Analysis (MSA) with MINITAB | Rp4,000,000 |
14-15 | Project Risk Management | Rp4,000,000 |
19-20 | Integrasi Sistem Manajemen ISO 9001, ISO 14001 & OHSAS 18001 (Sistem PAS 99) | Rp3,700,000 |
19-20 | Acceptance Sampling Plan (ASQ) | Rp4,000,000 |
19-20 | Design of Experiment (DoE) | Rp4,000,000 |
20-21 | 5S Toyota Production Systems (KAIZEN) | Rp4,000,000 |
20-21 | Implementasi 6S (5S + Safety) | Rp3,700,000 |
21-22 | Six Sigma Quality Using R (Open Source Software) | Rp4,000,000 |
21-22 | Design of Experiment (DoE) for Pharmaceutical | Rp4,000,000 |
21-22 | Teknik Pengendalian Korosi | Rp3,700,000 |
26-27 | Manajemen Pemeliharaan Peralatan Industri Berbasis Komputer (CMMS) | Rp4,000,000 |
28-29 | Teknik Menyusun Standard Operating Procedure (SOP) | Rp3,500,000 |
28-29 | Failure Analysis with Fault Tree Analysis (FTA) & Root Cause Failure Analysis (RCFA) | Rp4,000,000 |
28-29 | Lean Manufacturing | Rp3,700,000 |
MACHINE & ELECTRICAL ENGINEERING | ||
Tanggal | Judul Training | Harga |
5-6 | Implementasi SCADApada Instalasi Industri | Rp4,000,000 |
5-6 | Combustion and Burner | Rp4,000,000 |
5-6 | Diesel Electrical Set Operation and Maintenance | Rp4,000,000 |
6-8 | Industrial Electrical Installations | Rp5,500,000 |
6-8 | Electrical Safety and Power System Protection | Rp5,500,000 |
12-13 | Hydraulic Power System | Rp4,000,000 |
12-13 | Low Voltage Systems and Equipment (Operation And Maintenance) | Rp4,000,000 |
12-13 | Electrical Distribution System Protection | Rp4,000,000 |
12-14 | STEAM BOILERS (Operation, maintenance and troubleshooting) | Rp5,500,000 |
12-14 | Electric Power Transformer and Motor (Operation, Maintenance and Trouble Shooting) | Rp5,500,000 |
14-15 | Basic Power System Protections | Rp4,000,000 |
19-20 | Electrical Safety System | Rp4,000,000 |
19-20 | Low Voltage Equipment and Switchgear (Operation and Maintenance) | Rp4,000,000 |
19-21 | DYNAMIC PUMPS (Operation, Maintenance and Trouble Shooting) | Rp5,500,000 |
19-21 | Power Generation and Electrical Power Distribution | Rp5,500,000 |
19-21 | Safety Instrument System & Control | Rp5,500,000 |
19-21 | Lightning Protection and Grounding Systems | Rp5,500,000 |
20-22 | Power and Distribution Transformers (Operation and Maintenance) | Rp5,500,000 |
21-22 | Pipeline (Testing, Inspection and Maintenance) | Rp4,000,000 |
21-22 | Keselamatan dan Kesehatan Kerja (K3) Listrik | Rp4,000,000 |
21-22 | Basic Geothermal System, Mechanical and Electrical Aspects | Rp4,000,000 |
21-22 | Protection on Generators, Transformers and Networks | Rp4,000,000 |
26-27 | Electrical Power Distribution Networks and Controls | Rp4,000,000 |
26-27 | Electrical Diesel Generator (Operation And Maintenance) | Rp4,000,000 |
27-29 | INDUSTRIAL GAS TURBINES (Operation, Maintenance and Troubleshooting) | Rp5,500,000 |
27-29 | High Voltage Systems and Equipment (Operation and Maintenance) | Rp5,500,000 |
27-29 | Electrical Instruments, Meters and Indicators | Rp5,500,000 |
28-29 | Electrical Selection In Hazardous Area for Offshore Facilities | Rp4,000,000 |
28-29 | Instrumentation and Control on Generators and Turbines | Rp4,000,000 |
SUPPLY CHAIN | ||
Tanggal | Judul Training | Harga |
5-6 | Supplier Market Analysis | Rp3,700,000 |
5-6 | Dispatch Management System | Rp4,000,000 |
7-8 | RFID in Warehouse | Rp4,000,000 |
7-8 | Fundamental of Supply Chain Management & Logistic | Rp3,700,000 |
12-13 | Basic of Purchasing Management | Rp3,700,000 |
12-13 | Production Planning and Inventory Control (PPIC) | Rp4,000,000 |
14-15 | Reverse Logistics | Rp4,000,000 |
14-15 | Manajemen Transportasi | Rp4,000,000 |
19-20 | Effective Inventory Reduction | Rp4,000,000 |
19-20 | Vendor Management Inventory | Rp4,000,000 |
19-20 | Vendor Analysis and Selection | Rp4,000,000 |
21-22 | Owner Estimate Technique | Rp4,000,000 |
21-22 | Spare Part Management | Rp4,000,000 |
26-27 | Basic of Inventory Management & Warehouse Management | Rp3,700,000 |
26-27 | Negotiation Skills | Rp4,000,000 |
26-27 | Change Management in SCM | Rp4,000,000 |
26-27 | Continous Improvement Supply Chain dengan Simulasi Promodel | Rp4,000,000 |
28-29 | Driver Management | Rp4,000,000 |
28-29 | Competitor Market Analysis | Rp4,000,000 |
HEALTH, SAFETY & ENVIRONTMENT | ||
Tanggal | Judul Training | Harga |
5-6 | Implementasi ISO 14001:2015 | Rp3,700,000 |
5-6 | Pengendalian Bahan Beracun Berbahaya (B3) | Rp4,000,000 |
5-6 | Teknik Penyusunan AMDAL | Rp4,000,000 |
5-6 | Behaviour Safety | Rp4,000,000 |
5-6 | Hazard Communication | Rp4,000,000 |
7-8 | Dokumentasi ISO 14001:2015 | Rp3,700,000 |
7-8 | Industrial Disaster & Emergency Response | Rp4,000,000 |
7-8 | Incident Investigation | Rp4,000,000 |
7-8 | Pengelolaan Limbah Biologis | Rp4,000,000 |
12-13 | Implementasi OHSAS 18001:2007 | Rp3,700,000 |
12-13 | Internal Audit ISO 14001:2015 | Rp3,700,000 |
12-13 | Green Building and Factory | Rp4,000,000 |
12-13 | Teknik Penanganan Kondisi Tanggap darurat | Rp4,000,000 |
12-13 | Process Hazard Analysis Leader | Rp4,000,000 |
13-14 | Pengelolaan Limbah Industri | Rp4,000,000 |
14-15 | Dokumentasi OHSAS 18001:2007 | Rp3,700,000 |
14-15 | Hazard Operational (HAZOP) | Rp4,000,000 |
19-20 | Audit Internal OHSAS 18001:2007 | Rp3,700,000 |
19-20 | Risk Assessment (Analisa Resiko) & JSA (Job Safety Analysis) | Rp4,000,000 |
20-21 | Ergonomic In Workplace | Rp3,700,000 |
21-22 | Implementasi Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3 - PP No 50 Tahun 2012) | Rp3,700,000 |
26-27 | Teknik Instalasi Pengolahan Air Limbah (IPAL) | Rp4,000,000 |
27-28 | Persiapan Audit Lingkungan (PROPER) | Rp4,000,000 |
28-29 | Teknik Penyusunan dan Pemahaman MSDS | Rp4,000,000 |
28-29 | Implementasi ISO 14064:2006 (Perhitungan dan Penurunan Emisi Gas Rumah Kaca) | Rp4,000,000 |
FINANCE | ||
Tanggal | Judul Training | Harga |
6-7 | Advanced Budgeting and Cost Control | Rp3,700,000 |
14-15 | Financial Planning & Decision Making | Rp3,700,000 |
19-20 | Finance for Non Finance | Rp3,700,000 |
21-22 | Activity Based Costing | Rp3,700,000 |
21-22 | Budgeting and Project Cost Control | Rp3,700,000 |
26-27 | Export Import | Rp3,700,000 |
28-29 | Cash Management | Rp3,700,000 |
MARKETING | ||
Tanggal | Judul Training | Harga |
5-6 | Customer Satisfaction Survey (Methodology & Statistic) | Rp4,500,000 |
12-13 | Marketing Research with SPSS | Rp4,500,000 |
14-15 | Marketing Research with MS Excel | Rp4,500,000 |
19-20 | Advance Statistical Analysis For Marketing Research Using R (Open Source Software) | Rp4,500,000 |
HRD | ||
Tanggal | Judul Training | Harga |
6-7 | Fast Track To Be A Super Supervisor | Rp3,800,000 |
7-8 | Performance Management and Appraisal | Rp3,800,000 |
12-13 | HR for Non HR | Rp3,800,000 |
14-15 | Effective Customer Relationship Management (CRM) | Rp3,800,000 |
14-15 | Program Persiapan Pensiun | Rp3,800,000 |
19-20 | Handling Customer Complaint | Rp3,800,000 |
19-20 | Training Need Analysis | Rp3,800,000 |
20-21 | Human Capital Return on Investment | Rp3,800,000 |
21-22 | Corporate Social Responsibility (CSR) | Rp3,800,000 |
21-22 | Statistical Performance Control for Employee | Rp3,800,000 |
26-27 | Work Load Analysis | Rp3,800,000 |
26-27 | Design & Evaluation of Training Program | Rp3,800,000 |
28-29 | HR Management Based Competency | Rp3,800,000 |
28-29 | Competency Based Recruitment & Selection | Rp3,800,000 |
28-29 | Hukum Ketenagakerjaan | Rp3,800,000 |
MINING, OIL & GAS | ||
Tanggal | Judul Training | Harga |
5-6 | Teknologi Gasifikasi Batubara dan Penerapannya | Rp5,000,000 |
7-8 | Teknologi Pemanfaatan Batubara untuk PLTU | Rp5,000,000 |
14-15 | Teknik Preparasi, Pengujian dan Analisis Batubara | Rp5,000,000 |
19-20 | Coal Preparation Plant & Stockpile Management | Rp5,000,000 |
19-21 | Pengenalan Proses Preparasi Analisis Bahan Galian Industri dan Bahan Galian Logam | Rp5,500,000 |
21-22 | Teknologi Batubara Bersih | Rp5,000,000 |
28-29 | Teknologi Upgrading Batubara | Rp5,000,000 |
FOOD & AGRICULTURE | ||
Tanggal | Judul Training | Harga |
5-6 | Food Safety (HACCP) For Hotel, Restaurant & Catering | Rp4,000,000 |
6-7 | Good Manufacturing Practice: Cara Pengolahan Pangan yang Baik | Rp3,700,000 |
7-8 | Implementasi ISO 22000:2005 | Rp3,700,000 |
12-13 | Internal Audit ISO 22000:2005 | Rp3,700,000 |
19-20 | Penentuan Kadaluarsa Produk Pangan | Rp3,700,000 |
20-21 | GAP & GHP (Good Agriculture Practice & Good Handling Practice) | Rp4,000,000 |
21-22 | Dokumentasi ISO 22000:2005 | Rp3,700,000 |
28-29 | Pelatihan Operator Pertanian Organik | Rp3,700,000 |
CIVIL & CONTRUCTION | ||
Tanggal | Judul Training | Harga |
5-6 | Pengendalian Mutu Pekerjaan Beton Semen dan Perencanaan Campuran (Mix Design) | Rp4,500,000 |
12-13 | Pelaksanaan dan Pengendalian Mutu Pekerjaan Timbunan Badan Jalan | Rp4,500,000 |
14-15 | Pelaksanaan dan Pengendalian Mutu Pekerjaan Perkerasan Jalan Lentur (Flexible Pavement) | Rp4,500,000 |
26-27 | Pelaksanaan dan Pemeliharaan Jembatan | Rp4,500,000 |
Tidak ada komentar:
Posting Komentar