Tanggal | Judul | Harga |
---|---|---|
1-2 | Implementasi SNI ISO/IEC 17025:2008 | Rp3,500,000 |
1-2 | Teknik Kalibrasi Volumetric Glassware | Rp3,800,000 |
1-2 | Teknik Kalibrasi Conductivity Meter | Rp4,000,000 |
1-2 | Teknik Evaluasi Hasil QC Lab dan Kompetensi Analis | Rp3,800,000 |
1-2 | Verifikasi Hasil Kalibrasi & Evaluasi Intermediate Check | Rp3,800,000 |
3-4 | Dokumentasi SNI ISO/IEC 17025:2008 | Rp3,500,000 |
3-4 | Teknik Kalibrasi Massa (Anak Timbangan) | Rp3,800,000 |
3-4 | Sistem Pengukuran Gas dengan Flowmeter | Rp4,500,000 |
3-4 | Teknik Analisis Spektrofotometri Serapan Atom (AAS) Graphite Furnace | Rp4,500,000 |
3-4 | Sampling Control for Testing Sample | Rp3,800,000 |
3-4 | Implementasi K3 di Laboratorium | Rp4,000,000 |
8-9 | Internal Audit SNI ISO/IEC 17025:2008 | Rp3,500,000 |
8-9 | Teknik Kalibrasi Gaya (Load Cell) | Rp4,000,000 |
8-9 | Teknik Analisis Kromatografi Cair Kinerja Ultra (UPLC) | Rp4,500,000 |
8-9 | Pembuatan Contoh Uji Profisiensi dan Bahan Acuan Sekunder | Rp4,000,000 |
10-11 | Teknik Kalibrasi Suhu (Termokopel) | Rp4,000,000 |
10-11 | Teknik Analisis Kromatografi Gas Spektrometri Massa (GC-MS) | Rp4,500,000 |
10-11 | Estimasi Ketidakpastian Pengukuran pada Analisis Spektrofotometri (UV-Vis, FT-IR, AAS) | Rp3,800,000 |
10-11 | Teknik Investigasi dan Closing Temuan Asesmen Lab | Rp3,800,000 |
15-16 | Implementasi ISO/IEC 17020:2012 | Rp3,500,000 |
15-16 | Teknik Kalibrasi Suhu (Oven dan Furnace) | Rp4,000,000 |
15-16 | Teknik Analisis Inductively Coupled Plasma (ICP) MS | Rp4,500,000 |
15-16 | Estimasi Ketidakpastian Pengukuran Dimensi, Massa dan Volume | Rp3,800,000 |
15-16 | Kalibrasi, Verifikasi dan Troubleshooting pada GC-MS | Rp4,000,000 |
17-18 | Internal Audit ISO/IEC 17020:2012 | Rp3,500,000 |
17-18 | Teknik Kalibrasi Dimensi (Micrometer & Caliper) | Rp4,000,000 |
17-18 | Teknik Analisis Spektrofotometri Infra Merah (IR/FT-IR) | Rp4,000,000 |
17-18 | Kalibrasi, Verifikasi dan Troubleshooting pada UV-Vis | Rp4,000,000 |
22-23 | Dokumentasi SNI ISO 15189:2009 | Rp3,500,000 |
22-23 | Teknik Kalibrasi Listrik (Oscilloscope & Avometer Analog) | Rp4,000,000 |
22-23 | Teknik Analisis PCR-Elisa | Rp4,500,000 |
22-23 | Manajemen Kompetensi Personil Kalibrasi | Rp3,800,000 |
29-30 | Teknik Supervisi dan Inspeksi Mutu | Rp3,500,000 |
29-30 | Teknik Kalibrasi Tekanan (Pressure Gauge Digital Oil/Pneumatic) | Rp4,000,000 |
29-30 | Teknik Kalibrasi Listrik (Sine Wave Generator) | Rp4,000,000 |
29-30 | Quality Control Laboratorium | Rp3,800,000 |
29-30 | Verifikasi dan Validasi Metode Spektrofotometri UV-Vis | Rp3,800,000 |
1-2 | Implementasi ISO 9001:2008 | Rp3,300,000 |
1-2 | Zero Defect with Poka Yoke | Rp3,500,000 |
1-2 | Statistical Process Control & Capability Analysis with MS EXCEL | Rp3,500,000 |
1-2 | Project Management using Microsoft Project 2010 | Rp4,000,000 |
1-2 | Formulating Strategy-Based Initiatives with Balanced Scorecard | Rp3,500,000 |
3-4 | Internal Audit ISO 9001:2015 | Rp3,300,000 |
3-4 | Executive Introduction of ISO/TS 16949:2009 | Rp3,800,000 |
3-4 | Project Cost & Budgeting Strategies | Rp4,000,000 |
3-4 | Developing Effective Maintenance with Reliability-centred Maintenance | Rp4,000,000 |
3-4 | Achieving Zero Breakdown with Total Productive Maintenance | Rp3,800,000 |
8-9 | Internal Audit ISO 9001:2008 | Rp3,300,000 |
8-9 | Document Control | Rp3,500,000 |
8-9 | Implementasi 6S (5S + Safety) | Rp3,500,000 |
8-9 | Executive Awareness of Six Sigma Program | Rp3,800,000 |
8-9 | Statistical Process Control & Capability Analysis with MINITAB | Rp3,500,000 |
8-9 | Pengolahan dan Analisis Proses dengan Statistika Industri | Rp5,000,000 |
10-11 | E-document Management System | Rp3,500,000 |
10-11 | Acceptance Sampling Plan (ASQ) | Rp4,000,000 |
10-11 | Cost of Quality Executive Overview | Rp3,500,000 |
15-16 | Implementasi ISO 9001 + IWA 2 | Rp3,300,000 |
15-16 | Strategic Cost Reduction for Competitive Advantage | Rp3,500,000 |
15-16 | Continous Improvement Proses Produksi dengan Simulasi Promodel | Rp4,000,000 |
16-18 | Audit Internal Integrasi Sistem ISO 9001, ISO 14001 & OHSAS 18001 (Based on ISO 19011) | Rp4,500,000 |
17-18 | Teknik Pengujian Tabung LPG | Rp3,500,000 |
17-18 | Dokumentasi ISO 9001:2008 | Rp3,300,000 |
22-23 | Implementasi ISO 9001:2015 | Rp3,300,000 |
22-23 | Lean Six Sigma | Rp4,000,000 |
22-23 | Acceptance Sampling Plan (ISO 2859, MIL STD 105E & 414) | Rp4,000,000 |
22-23 | Managing Failure with Failure Mode and Effect Analysis (FMEA) | Rp3,800,000 |
29-30 | Dokumentasi ISO 9001:2015 | Rp3,300,000 |
29-30 | Implementasi 5S (Seiro, Seiton, Seiso, Seiketsu, Shitsuke) | Rp3,500,000 |
29-30 | Improvement with Quality Control Circle (QCC) | Rp3,500,000 |
29-30 | Managing Failure with P-M and Why - why Analysis | Rp4,000,000 |
1-2 | Electrical Submersible Pumps | Rp4,000,000 |
1-2 | Electricity For Non Electrician | Rp4,000,000 |
1-2 | Electric Motor ( Operation, Maintenance and Trouble Shooting) | Rp4,000,000 |
1-2 | Power Electronics and Drives | Rp4,000,000 |
1-3 | ROLLER BEARINGS (Basic, Operation, Maintenance and Troubleshooting) | Rp5,500,000 |
1-3 | Electrical Power Motor – Generator (Operation, Protection and Maintanance) | Rp5,500,000 |
1-3 | High Voltage Equipment and Switchgear (Operation and Maintenance) | Rp5,500,000 |
3-4 | Medium Voltage Systems and Equipment (Operation and Maintenance) | Rp4,000,000 |
8-9 | Low Voltage Electrical Power System Distribution | Rp4,000,000 |
8-10 | TURBO COMPRESSORS (Operation, Maintenance and Troubleshooting) | Rp5,500,000 |
8-10 | 150 Kv Electrical Transmission Operation (Equipment and Maintenance) | Rp5,500,000 |
8-10 | Manajemen Perawatan Bangunan Gedung Dan Fasilitas (Building Maintenance) | Rp5,500,000 |
8-10 | Electrical Powerline | Rp5,500,000 |
9-10 | Teknik Lubrikasi | Rp4,000,000 |
10-11 | Motor Induksi (Maintenance & Troubleshooting) | Rp4,000,000 |
10-11 | Low Voltage Distribution and Protection Systems | Rp4,000,000 |
15-16 | Advance Instrument and Control | Rp4,000,000 |
15-17 | STEAM TURBINES (Operation, maintenance and troubleshooting) | Rp5,500,000 |
15-17 | Power Transformer Diagnosis, Monitoring and Analysis | Rp5,500,000 |
15-17 | Electrical Power System Analysis Using Etap | Rp5,500,000 |
17-18 | Belt Conveyor (Maintenance & Troubleshooting) | Rp4,000,000 |
22-23 | PLC Programming Principle and Practice Simulations | Rp4,000,000 |
22-23 | Process Control & Loop Tunning | Rp4,000,000 |
29-30 | Electrical Maintenance : Low and Medium Voltage Networks | Rp4,000,000 |
29-30 | Electrostatic Ignition Of Fire and Explosion | Rp4,000,000 |
1-2 | Fundamental of Supply Chain Management & Logistic | Rp3,500,000 |
1-2 | Basic of Procurement Management | Rp3,500,000 |
1-2 | Fleet Management | Rp3,800,000 |
1-2 | Dispatch Management System | Rp4,000,000 |
1-2 | Production Planning and Inventory Control (PPIC) | Rp4,000,000 |
3-4 | Green Logistics | Rp3,800,000 |
3-4 | Safety In Logistics | Rp3,800,000 |
8-9 | Change Management in SCM | Rp4,000,000 |
8-9 | Integrated Logistic Management | Rp4,000,000 |
9-10 | Modern Warehouse Design | Rp4,000,000 |
10-11 | Basic of Transportation and Distribution | Rp3,500,000 |
10-11 | KPI Design for Warehouse | Rp3,800,000 |
15-16 | Vendor Management Inventory | Rp4,000,000 |
17-18 | Decision Making with Analytical Hierarchy Process (AHP) | Rp4,000,000 |
22-23 | Vendor Selection | Rp4,000,000 |
22-23 | Vendor Analysis and Selection | Rp4,000,000 |
22-23 | Material Management | Rp3,500,000 |
29-30 | Basic of Logistics Practices | Rp3,500,000 |
29-30 | E-Procurement | Rp3,800,000 |
29-30 | Competitor Market Analysis | Rp4,000,000 |
29-30 | IMPLEMENTASI ISO 28001:2007 Sistem Manajemen Keamanan untuk Rantai Pasokan | Rp4,000,000 |
1-2 | Implementasi OHSAS 18001:2007 | Rp3,500,000 |
1-2 | Risk Assessment (Analisa Resiko) Kimia | Rp4,000,000 |
1-2 | Hazard Identification and Risk Assessment (HIRA) | Rp4,000,000 |
1-2 | Pengelolaan Limbah Cair | Rp4,000,000 |
3-4 | Dokumentasi OHSAS 18001:2007 | Rp3,500,000 |
3-4 | Safety Risk Management | Rp4,000,000 |
3-4 | Surat Izin Bekerja (working Permit) | Rp4,000,000 |
3-4 | Pengelolaan Limbah Padat | Rp4,000,000 |
8-9 | Audit Internal OHSAS 18001:2007 | Rp3,500,000 |
8-9 | Audit dan Manajemen Energi di Industri (Based on ISO 50001:2011) | Rp4,000,000 |
8-9 | Implementasi Standar Manajemen Resiko ISO 31000:2009 | Rp3,500,000 |
8-9 | Penanggulangan Tumpahan | Rp4,000,000 |
9-10 | Waste Water Treatment | Rp4,000,000 |
10-11 | Implementasi ISO 14001:2004 | Rp3,500,000 |
10-11 | Green Procurement/RoHS System Guidelines | Rp4,000,000 |
10-11 | Process Safety Management (Awareness) | Rp4,500,000 |
15-16 | Internal Audit ISO 14001:2004 | Rp3,500,000 |
15-16 | Globally Harmonized System (GHS) Sistem Klasifikasi dan Pelabelan Bahan Kimia B3 | Rp4,500,000 |
15-16 | Process Hazard Analysis (PHA) Awareness | Rp4,000,000 |
17-18 | Transportasi Bahan Beracun Berbahaya (B3) | Rp4,000,000 |
22-23 | Dokumentasi ISO 14001:2004 | Rp3,500,000 |
22-23 | Monitoring Lingkungan | Rp4,000,000 |
29-30 | Pembuatan Laporan Lingkungan | Rp4,000,000 |
3-4 | Asset Management | Rp3,500,000 |
10-11 | Effective Cashflow Management | Rp3,500,000 |
15-16 | Financial Statement Analysis | Rp3,500,000 |
17-18 | Basic Accounting | Rp3,500,000 |
22-23 | Teknik Penyusunan Laporan Keuangan | Rp3,500,000 |
29-30 | Petty Cash Management & Administration | Rp3,500,000 |
3-4 | Brand Equity Survey (Methodology & Statistic) | Rp4,500,000 |
15-16 | Basic Statistical Analysis For Marketing Research Using R (Open Source Software) | Rp4,500,000 |
22-23 | Data Mining | Rp4,000,000 |
1-2 | IMPLEMENTASI ISO 260001:2010 Guidance on Social Responsibility | Rp4,000,000 |
1-2 | Fast Track To Be A Super Manager | Rp3,500,000 |
3-4 | Job Analysis | Rp3,500,000 |
3-4 | How to Develop and Implementing Winning KPI | Rp3,500,000 |
8-9 | Strategic HRM and The HR Scorecard | Rp3,500,000 |
10-11 | Strategic Performance Management | Rp3,500,000 |
10-11 | Outsourcing Management | Rp3,500,000 |
10-11 | Competency Assessment | Rp3,500,000 |
15-16 | Human Capital Management | Rp3,500,000 |
15-16 | Competency Based Pay | Rp3,500,000 |
17-18 | HR Metrics: Driving HR Success | Rp3,500,000 |
22-23 | Training of Trainer | Rp3,500,000 |
29-30 | Teknik Survey Kepuasan Karyawan | Rp3,500,000 |
29-30 | Competency - Based Human Capital Management | Rp3,500,000 |
1-2 | Teknologi Gasifikasi Batubara dan Penerapannya | Rp5,000,000 |
1-3 | Model Pengambilan Sampel dan Metoda Perhitungan Cadangan Bijih Nikel | Rp5,500,000 |
3-4 | Teknologi Pemanfaatan Batubara untuk PLTU | Rp5,000,000 |
8-10 | Pengenalan Bahan Peledak dan Proses Peledakan dalam Tambang Terbuka dan Tambang Bawah Tanah | Rp5,500,000 |
10-11 | Teknik Sampling Batubara | Rp5,000,000 |
15-16 | Coal Handling | Rp5,000,000 |
17-18 | Energi Batubara dan Pemanfaatannya | Rp5,000,000 |
22-23 | Teknologi Pengolahan dan Pemanfaatan Batubara | Rp5,000,000 |
1-2 | Dokumentasi ISO 22000:2005 | Rp3,500,000 |
3-4 | Penyusunan Dokumen Sistem Mutu Pangan Organik | Rp3,500,000 |
10-11 | Pelatihan Fasilitator Pertanian Organik | Rp3,500,000 |
15-16 | Implementasi ISO 22000:2005 | Rp3,500,000 |
15-16 | Implementasi HACCP | Rp3,500,000 |
15-16 | Pelatihan Inspektor Organik | Rp3,500,000 |
17-18 | Internal Audit ISO 22000:2005 | Rp3,500,000 |
17-18 | Food Safety Program ( Inspection, Sampling, Pest Management) | Rp3,800,000 |
22-23 | Food Safety System Certification | Rp3,800,000 |
29-30 | Internal Audit FSSC 22000 | Rp3,800,000 |
8-9 | Pelaksanaan dan Pengendalian Mutu Pekerjaan Perkerasan Jalan Beton (Rigid Pavement) | Rp4,500,000 |
10-11 | Pengendalian Mutu Pekerjaan Beton Aspal Panas (Hot Mix) dan Pembuatan Job Mix Formula (JMF) | Rp4,500,000 |
17-18 | Sistem Perkuatan Lereng jalan | Rp4,500,000 |
Pelatihan Dokument Control, Pelatihan Dokument Management System, Pelatihan Dokument Management, Pelatihan Filling System Dokumentation, Pelatihan Iso Dokument Control 2012,Training Dokumen Kontrol, Training Document, Training Dokumen Kontrol Iso, Training Pengendalian Dokumen, Training Filling Dokumen, Training Untuk Dokumen Kontrol, Training Pengelolaan Dokumen, Dokumentasi Dalam Iso, Pengendalian Iso 17025, Dokumentasi Iso 17025, Sistem Dokumentasi Iso 9001 Internal Audit Iso 17025
Minggu, 06 September 2015
Jadwal Training Bulan September 2015
Langganan:
Posting Komentar (Atom)
Tidak ada komentar:
Posting Komentar