Status | Tanggal | Judul | Harga |
---|---|---|---|
Hub Admin | 6-7 | Implementasi SNI ISO/IEC 17025:2008 | Rp3,500,000 |
Hub Admin | 6-7 | Teknik Analisis Data di Laboratorium | Rp4,000,000 |
Hub Admin | 6-7 | Teknik Kalibrasi Listrik (Frequency Counter & Function Generator) | Rp4,000,000 |
Hub Admin | 6-7 | Teknik Analisis IC (Ion Chromatography) | Rp4,500,000 |
Hub Admin | 6-7 | Estimasi Ketidakpastian Pengukuran Hasil Kalibrasi | Rp3,800,000 |
Hub Admin | 11-12 | Dokumentasi SNI ISO/IEC 17025:2008 | Rp3,500,000 |
Hub Admin | 11-12 | Teknik Kalibrasi Listrik (Insulation Tester & Withstanding Voltage) | Rp4,000,000 |
Hub Admin | 11-12 | Sistem Pengukuran Air dengan Flowmeter | Rp4,500,000 |
Hub Admin | 11-12 | Teknik Analisis Scanning Electron Microscope (SEM) | Rp4,500,000 |
Hub Admin | 11-12 | Penanganan Bahan Acuan Bersertifikat (CRM) | Rp4,000,000 |
Hub Admin | 11-12 | Kalibrasi, Verifikasi dan Troubleshooting pada GC | Rp4,000,000 |
Hub Admin | 13-14 | Internal Audit SNI ISO/IEC 17025:2008 | Rp3,500,000 |
Hub Admin | 13-14 | Teknik Kalibrasi Gaya (Proving Ring) | Rp4,000,000 |
Hub Admin | 13-14 | Sistem Pengukuran Minyak dengan Flowmeter | Rp4,500,000 |
Hub Admin | 13-14 | Teknik Analisis Spektrofotometri Serapan Atom (AAS) Flame | Rp4,500,000 |
Hub Admin | 13-14 | Quality Assurance Laboratorium | Rp3,800,000 |
Hub Admin | 13-14 | Verifikasi dan Validasi Metode Uji Kimia | Rp3,800,000 |
Hub Admin | 18-19 | Sistem Manajemen Informatika Laboratorium | Rp4,000,000 |
Hub Admin | 18-19 | Teknik Kalibrasi Suhu (Termometer) | Rp4,000,000 |
Hub Admin | 18-19 | Teknik Analisis Kromatografi Cair Kinerja Tinggi (HPLC) | Rp4,500,000 |
Hub Admin | 18-19 | Kaji Ulang Manajemen dan Pengendalian Sistem Laboratorium | Rp3,800,000 |
Hub Admin | 18-19 | Verifikasi dan Validasi Metode Kromatografi Gas (GC) | Rp3,800,000 |
Hub Admin | 19-20 | Teknik Kalibrasi Massa (Timbangan) | Rp3,800,000 |
Hub Admin | 20-21 | Dokumentasi ISO/IEC 17020:2012 | Rp3,500,000 |
Hub Admin | 20-21 | Teknik Kalibrasi Suhu (Termohigrometer) | Rp4,000,000 |
Hub Admin | 20-21 | Teknik Analisis Kromatografi Gas (GC) | Rp4,500,000 |
Hub Admin | 20-21 | Uji Profisiensi Laboratorium (SNI-ISO/IEC 17043-2010) | Rp3,800,000 |
Hub Admin | 20-21 | Manajemen Peralatan Lab & Evaluasi Performa Alat ukur | Rp3,800,000 |
Hub Admin | 25-26 | Implementasi SNI ISO 15189:2009 | Rp3,500,000 |
Hub Admin | 25-26 | Sistem Pengukuran dan Kalibrasi | Rp3,800,000 |
Hub Admin | 25-26 | Teknik Kalibrasi pH Meter | Rp4,000,000 |
Hub Admin | 25-26 | Teknik Analisis Inductively Coupled Plasma (ICP) OES | Rp4,500,000 |
Hub Admin | 25-26 | Estimasi Ketidakpastian Pengukuran Analisis Kimia | Rp3,800,000 |
Hub Admin | 25-26 | Pengendalian Alat dan Bahan Kimia di Laboratorium | Rp4,000,000 |
Hub Admin | 27-28 | Internal Audit SNI ISO 15189:2009 | Rp3,500,000 |
Hub Admin | 27-28 | Teknik Kalibrasi Tekanan (Pressure Gauge Analog Oil/Pneumatic) | Rp4,000,000 |
Hub Admin | 27-28 | Teknik Kalibrasi Listrik (Multimeter & RF Power Meter) | Rp4,000,000 |
Hub Admin | 27-28 | Teknik Analisis Spektrofotometri UV-Vis | Rp4,000,000 |
Hub Admin | 27-28 | Estimasi Ketidakpastian Pengukuran pada Analisis Kromatografi | Rp3,800,000 |
Hub Admin | 4-5 | Implementasi ISO 9001:2015 | Rp3,300,000 |
Hub Admin | 6-7 | Implementasi ISO 9001:2008 | Rp3,300,000 |
Hub Admin | 6-7 | Implementasi ISO 9001 + IWA 2 | Rp3,300,000 |
Hub Admin | 6-7 | HORENSO (Houkoku-Renraku-Soudan) Japanese Communication System | Rp3,500,000 |
Hub Admin | 6-7 | Six Sigma Quality Using R (Open Source Software) | Rp4,000,000 |
Hub Admin | 6-7 | Statistical Process Control & Capability Analysis with MS EXCEL | Rp3,500,000 |
Hub Admin | 6-7 | Design of Experiment (DoE) | Rp3,800,000 |
Hub Admin | 6-7 | Manajemen Pemeliharaan Peralatan Industri Berbasis Komputer (CMMS) | Rp3,800,000 |
Hub Admin | 6-7 | Acceptance Sampling Plan (ASQ) | Rp4,000,000 |
Hub Admin | 11-12 | Dokumentasi ISO 9001:2008 | Rp3,300,000 |
Hub Admin | 11-12 | Project Risk Management | Rp4,000,000 |
Hub Admin | 11-12 | Lean Manufacturing | Rp3,500,000 |
Hub Admin | 13-14 | Internal Audit ISO 9001:2015 | Rp3,300,000 |
Hub Admin | 13-14 | Implementasi 5S (Seiro, Seiton, Seiso, Seiketsu, Shitsuke) | Rp3,500,000 |
Hub Admin | 13-14 | Implementasi 6S (5S + Safety) | Rp3,500,000 |
Hub Admin | 13-14 | Total Quality Management (TQM) | Rp3,800,000 |
Hub Admin | 13-14 | Statistical Process Control & Capability Analysis with MINITAB | Rp3,500,000 |
Hub Admin | 13-14 | Basic of Project Management | Rp3,800,000 |
Hub Admin | 13-14 | Manufacturing Performance Indicator | Rp4,000,000 |
Hub Admin | 13-14 | Failure Analysis with Fault Tree Analysis (FTA) & Root Cause Failure Analysis (RCFA) | Rp4,000,000 |
Hub Admin | 18-19 | Internal Audit ISO 9001:2008 | Rp3,300,000 |
Hub Admin | 18-19 | Acceptance Sampling Plan (ISO 2859, MIL STD 105E & 414) | Rp4,000,000 |
Hub Admin | 20-21 | Dokumentasi ISO 9001:2015 | Rp3,300,000 |
Hub Admin | 20-21 | Product Development with APQP and PPAP | Rp3,800,000 |
Hub Admin | 20-21 | Maintenance Priority Index (MPI) dengan Proses SERP (Sistem & Equipment Reliability & Prioritization) | Rp4,000,000 |
Hub Admin | 25-26 | Integrasi Sistem Manajemen ISO 9001, ISO 14001 & OHSAS 18001 (Sistem PAS 99) | Rp3,500,000 |
Hub Admin | 25-26 | Teknik Menyusun Standard Operating Procedure (SOP) | Rp3,300,000 |
Hub Admin | 25-26 | Measurement System Analysis (MSA) with MINITAB | Rp3,800,000 |
Hub Admin | 25-26 | Business Process Reengineering | Rp3,500,000 |
Hub Admin | 26-27 | Pengolahan dan Analisis Data Kegagalan | Rp5,000,000 |
Hub Admin | 27-28 | 5S Toyota Production Systems (KAIZEN) | Rp3,800,000 |
Hub Admin | 27-28 | Design of Experiment (DoE) for Pharmaceutical | Rp3,800,000 |
Hub Admin | 27-28 | Teknik Pengendalian Korosi | Rp3,500,000 |
Hub Admin | 11-12 | Low Voltage Equipment and Switchgear (Operation and Maintenance) | Rp4,000,000 |
Hub Admin | 11-12 | Implementasi SCADApada Instalasi Industri | Rp4,000,000 |
Hub Admin | 11-13 | STEAM BOILERS (Operation, maintenance and troubleshooting) | Rp5,500,000 |
Hub Admin | 11-13 | Industrial Electrical Installations | Rp5,500,000 |
Hub Admin | 13-14 | Diesel Electrical Set Operation and Maintenance | Rp4,000,000 |
Hub Admin | 13-14 | Basic Power System Protections | Rp4,000,000 |
Hub Admin | 13-14 | Combustion and Burner | Rp4,000,000 |
Hub Admin | 13-14 | Electrical Distribution System Protection | Rp4,000,000 |
Hub Admin | 18-19 | Electrical Power Distribution Networks and Controls | Rp4,000,000 |
Hub Admin | 18-19 | Keselamatan dan Kesehatan Kerja (K3) Listrik | Rp4,000,000 |
Hub Admin | 18-20 | Power and Distribution Transformers (Operation and Maintenance) | Rp5,500,000 |
Hub Admin | 18-20 | Electrical Safety and Power System Protection | Rp5,500,000 |
Hub Admin | 18-20 | DYNAMIC PUMPS (Operation, Maintenance and Trouble Shooting) | Rp5,500,000 |
Hub Admin | 20-21 | Hydraulic Power System | Rp4,000,000 |
Hub Admin | 20-21 | Low Voltage Systems and Equipment (Operation And Maintenance) | Rp4,000,000 |
Hub Admin | 20-21 | Electrical Selection In Hazardous Area for Offshore Facilities | Rp4,000,000 |
Hub Admin | 20-21 | Basic Geothermal System, Mechanical and Electrical Aspects | Rp4,000,000 |
Hub Admin | 25-26 | Electrical Safety System | Rp4,000,000 |
Hub Admin | 25-26 | Instrumentation and Control on Generators and Turbines | Rp4,000,000 |
Hub Admin | 25-27 | INDUSTRIAL GAS TURBINES (Operation, Maintenance and Troubleshooting) | Rp5,500,000 |
Hub Admin | 25-27 | Power Generation and Electrical Power Distribution | Rp5,500,000 |
Hub Admin | 25-27 | High Voltage Systems and Equipment (Operation and Maintenance) | Rp5,500,000 |
Hub Admin | 25-27 | Safety Instrument System & Control | Rp5,500,000 |
Hub Admin | 25-27 | Electric Power Transformer and Motor (Operation, Maintenance and Trouble Shooting) | Rp5,500,000 |
Hub Admin | 25-27 | Lightning Protection and Grounding Systems | Rp5,500,000 |
Hub Admin | 26-28 | Electrical Instruments, Meters and Indicators | Rp5,500,000 |
Hub Admin | 27-28 | Pipeline (Testing, Inspection and Maintenance) | Rp4,000,000 |
Hub Admin | 27-28 | Electrical Diesel Generator (Operation And Maintenance) | Rp4,000,000 |
Hub Admin | 27-28 | Protection on Generators, Transformers and Networks | Rp4,000,000 |
Hub Admin | 6-7 | Fundamental of Supply Chain Management & Logistic | Rp3,500,000 |
Hub Admin | 6-7 | Vendor Relationship Management | Rp4,000,000 |
Hub Admin | 6-7 | Principles of Land Transportation | Rp4,000,000 |
Hub Admin | 11-12 | Effective Inventory Reduction | Rp3,800,000 |
Hub Admin | 13-14 | Supplier Market Analysis | Rp3,500,000 |
Hub Admin | 13-14 | Owner Estimate Technique | Rp3,800,000 |
Hub Admin | 13-14 | Negotiation Skills | Rp3,800,000 |
Hub Admin | 13-14 | RFID in Warehouse | Rp4,000,000 |
Hub Admin | 18-19 | Basic of Inventory Management & Warehouse Management | Rp3,500,000 |
Hub Admin | 18-19 | Driver Management | Rp3,800,000 |
Hub Admin | 18-19 | Communication Skills in Logistics | Rp4,000,000 |
Hub Admin | 20-21 | Basic of Purchasing Management | Rp3,500,000 |
Hub Admin | 20-21 | Managing People in SCM & Logistic | Rp4,000,000 |
Hub Admin | 20-21 | Vehicle Routing Problem | Rp4,000,000 |
Hub Admin | 20-21 | Manajemen Transportasi | Rp4,000,000 |
Hub Admin | 25-26 | Reverse Logistics | Rp3,800,000 |
Hub Admin | 25-26 | Spare Part Management | Rp3,500,000 |
Hub Admin | 26-27 | Continous Improvement Supply Chain dengan Simulasi Promodel | Rp4,000,000 |
Hub Admin | 27-28 | Production Planning and Scheduling (product by order) | Rp4,000,000 |
Hub Admin | 6-7 | Implementasi OHSAS 18001:2007 | Rp3,500,000 |
Hub Admin | 6-7 | Hazard Communication | Rp4,000,000 |
Hub Admin | 11-12 | Dokumentasi OHSAS 18001:2007 | Rp3,500,000 |
Hub Admin | 11-12 | Industrial Disaster & Emergency Response | Rp4,000,000 |
Hub Admin | 11-12 | Risk Assessment (Analisa Resiko) & JSA (Job Safety Analysis) | Rp4,000,000 |
Hub Admin | 13-14 | Audit Internal OHSAS 18001:2007 | Rp3,500,000 |
Hub Admin | 13-14 | Teknik Instalasi Pengolahan Air Limbah (IPAL) | Rp4,000,000 |
Hub Admin | 13-14 | Teknik Penyusunan dan Pemahaman MSDS | Rp4,000,000 |
Hub Admin | 13-14 | Pengelolaan Limbah Biologis | Rp4,000,000 |
Hub Admin | 18-19 | Dokumentasi ISO 14001:2004 | Rp3,500,000 |
Hub Admin | 18-19 | Green Building and Factory | Rp4,000,000 |
Hub Admin | 18-19 | Behaviour Safety | Rp4,000,000 |
Hub Admin | 20-21 | Pengendalian Bahan Beracun Berbahaya (B3) | Rp4,000,000 |
Hub Admin | 20-21 | Implementasi ISO 14064:2006 (Perhitungan dan Penurunan Emisi Gas Rumah Kaca) | Rp4,000,000 |
Hub Admin | 20-21 | Incident Investigation | Rp4,000,000 |
Hub Admin | 20-21 | Teknik Penanganan Kondisi Tanggap darurat | Rp4,000,000 |
Hub Admin | 20-21 | Ergonomic In Workplace | Rp3,500,000 |
Hub Admin | 25-26 | Internal Audit ISO 14001:2004 | Rp3,500,000 |
Hub Admin | 25-26 | Teknik Penyusunan AMDAL | Rp4,000,000 |
Hub Admin | 25-26 | Implementasi Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3 - PP No 50 Tahun 2012) | Rp3,500,000 |
Hub Admin | 25-26 | Hazard Operational (HAZOP) | Rp4,000,000 |
Hub Admin | 25-26 | Pengelolaan Limbah Industri | Rp4,000,000 |
Hub Admin | 26-27 | Persiapan Audit Lingkungan (PROPER) | Rp4,000,000 |
Hub Admin | 27-28 | Implementasi ISO 14001:2004 | Rp3,500,000 |
Hub Admin | 27-28 | Process Hazard Analysis Leader | Rp4,000,000 |
Hub Admin | 6-7 | Activity Based Costing | Rp3,500,000 |
Hub Admin | 6-7 | Export Import | Rp3,500,000 |
Hub Admin | 13-14 | Advanced Budgeting and Cost Control | Rp3,500,000 |
Hub Admin | 18-19 | Financial Planning & Decision Making | Rp3,500,000 |
Hub Admin | 20-21 | Finance for Non Finance | Rp3,500,000 |
Hub Admin | 25-26 | Budgeting and Project Cost Control | Rp3,500,000 |
Hub Admin | 27-28 | Cash Management | Rp3,500,000 |
Hub Admin | 6-7 | Customer Satisfaction Survey (Methodology & Statistic) | Rp4,500,000 |
Hub Admin | 13-14 | Marketing Research with SPSS | Rp4,500,000 |
Hub Admin | 20-21 | Advance Statistical Analysis For Marketing Research Using R (Open Source Software) | Rp4,500,000 |
Hub Admin | 25-26 | Marketing Research with MS Excel | Rp4,500,000 |
Hub Admin | 6-7 | HR Management Based Competency | Rp3,500,000 |
Hub Admin | 6-7 | Program Persiapan Pensiun | Rp3,500,000 |
Hub Admin | 6-7 | Hukum Ketenagakerjaan | Rp3,500,000 |
Hub Admin | 6-7 | Fast Track To Be A Super Supervisor | Rp3,500,000 |
Hub Admin | 11-12 | Training Need Analysis | Rp3,500,000 |
Hub Admin | 13-14 | Statistical Performance Control for Employee | Rp3,500,000 |
Hub Admin | 13-14 | Performance Management and Appraisal | Rp3,500,000 |
Hub Admin | 18-19 | Work Load Analysis | Rp3,500,000 |
Hub Admin | 20-21 | Handling Customer Complaint | Rp3,500,000 |
Hub Admin | 20-21 | Design & Evaluation of Training Program | Rp3,500,000 |
Hub Admin | 25-26 | Competency Based Recruitment & Selection | Rp3,500,000 |
Hub Admin | 25-26 | Effective Customer Relationship Management (CRM) | Rp3,500,000 |
Hub Admin | 25-26 | Corporate Social Responsibility (CSR) | Rp3,500,000 |
Hub Admin | 27-28 | HR for Non HR | Rp3,500,000 |
Hub Admin | 27-28 | Human Capital Return on Investment | Rp3,500,000 |
Hub Admin | 6-7 | Teknologi Gasifikasi Batubara dan Penerapannya | Rp5,000,000 |
Hub Admin | 11-12 | Teknologi Pemanfaatan Batubara untuk PLTU | Rp5,000,000 |
Hub Admin | 11-13 | Pengenalan Proses Preparasi Analisis Bahan Galian Industri dan Bahan Galian Logam | Rp5,500,000 |
Hub Admin | 18-19 | Teknik Preparasi, Pengujian dan Analisis Batubara | Rp5,000,000 |
Hub Admin | 18-20 | Pengenalan Pemanfaatan dan Pengolahan Batu Mulia | Rp5,500,000 |
Hub Admin | 20-21 | Coal Preparation Plant & Stockpile Management | Rp5,000,000 |
Hub Admin | 25-26 | Teknologi Batubara Bersih | Rp5,000,000 |
Hub Admin | 27-28 | Teknologi Upgrading Batubara | Rp5,000,000 |
Hub Admin | 6-7 | Implementasi ISO 22000:2005 | Rp3,500,000 |
Hub Admin | 6-7 | Good Manufacturing Practice: Cara Pengolahan Pangan yang Baik | Rp3,500,000 |
Hub Admin | 11-12 | Internal Audit ISO 22000:2005 | Rp3,500,000 |
Hub Admin | 13-14 | Penentuan Kadaluarsa Produk Pangan | Rp3,500,000 |
Hub Admin | 18-19 | Pelatihan Operator Pertanian Organik | Rp3,500,000 |
Hub Admin | 20-21 | Dokumentasi ISO 22000:2005 | Rp3,500,000 |
Hub Admin | 25-26 | Food Safety (HACCP) For Hotel, Restaurant & Catering | Rp3,800,000 |
Hub Admin | 27-28 | GAP & GHP (Good Agriculture Practice & Good Handling Practice) | Rp3,800,000 |
Hub Admin | 11-12 | Pelaksanaan dan Pengendalian Mutu Pekerjaan Perkerasan Jalan Lentur (Flexible Pavement) | Rp4,500,000 |
Hub Admin | 13-14 | Pengendalian Mutu Pekerjaan Beton Semen dan Perencanaan Campuran (Mix Design) | Rp4,500,000 |
Hub Admin | 20-21 | Pelaksanaan dan Pengendalian Mutu Pekerjaan Timbunan Badan Jalan | Rp4,500,000 |
Hub Admin | 25-26 | Pelaksanaan dan Pemeliharaan Jembatan | Rp4,500,000 |
Pelatihan Dokument Control, Pelatihan Dokument Management System, Pelatihan Dokument Management, Pelatihan Filling System Dokumentation, Pelatihan Iso Dokument Control 2012,Training Dokumen Kontrol, Training Document, Training Dokumen Kontrol Iso, Training Pengendalian Dokumen, Training Filling Dokumen, Training Untuk Dokumen Kontrol, Training Pengelolaan Dokumen, Dokumentasi Dalam Iso, Pengendalian Iso 17025, Dokumentasi Iso 17025, Sistem Dokumentasi Iso 9001 Internal Audit Iso 17025
Senin, 03 Agustus 2015
Jadwal Training Bulan Agustus 2015
Langganan:
Posting Komentar (Atom)
Tidak ada komentar:
Posting Komentar